Frame Linair filler

Cost reduction by innovation

Banner1

Client:
Stork Food & Dairy Systems, Amsterdam

Challenge:
The linear filler is used for filling products in a sterile manner. A high cost structure applies for the product family linear filler.

Result:
- Renewed design of the frame in 4 variants
- Renewed supply chain, high-quality outsourcing, reduction of supply and assembly risks
- Production method: laser welding
- Cost reduction: 37%
- Time to market; 12 weeks (from start basic)

Our approach:
Combined, the existing functions and issues have been formulated together with SFDS project team members. After that, Post en Dekker concerned itself with the integral project management task. In consultation with a supplier, research has been done with regard to if and how the frame can be produced by means of laser welding. Part of the frame has been designed, calculated and produced as test wall. Parallel to this there has been procurement. After evaluation of the test wall, the basic design has been further developed and rolled out over 4 variants of the frame. To conclude, the detailed design has been worked-out and delivered, including 3D/2D CAD and SAP lists.